<incidents><incident id="ME22-002034"><polyline>44.912441 -68.684527 44.912441 -68.684528</polyline><street>Stillwater Ave</street><type>CONSTRUCTION</type><starttime>2022-08-11T11:08:14Z</starttime><endtime>2022-08-11T11:08:14Z</endtime><description>Old Town Stillwater Avenue, the Llewellyn Estes Bridge has been posted to 30 Ton</description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-004318"><polyline>44.367463 -70.995664 44.367464 -70.995664</polyline><street>ME-113</street><type>HAZARD</type><starttime>2025-11-17T14:30:34Z</starttime><endtime>2025-11-17T14:30:34Z</endtime><description>Gilead Route 113 from Stow to Gilead, through Evans Notch, has been closed for the winter season. </description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001005"><polyline>44.217996 -69.646877 44.217996 -69.646876</polyline><street>ME-126</street><type>HAZARD</type><starttime>2026-03-21T19:05:41Z</starttime><endtime>2026-03-21T19:05:41Z</endtime><description>Whitefield  Rte 126 closed until further notice between near Rooney Rd and Hunts Meadow Road due to emergence bridge repairs.
Follow detour.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME23-001011"><polyline>44.547404 -69.626905 44.547405 -69.626905</polyline><street>US-201</street><type>CONSTRUCTION</type><starttime>2023-04-03T16:00:00Z</starttime><endtime>2026-08-01T11:00:00Z</endtime><description>Waterville, Route 201, The Ticonic Bridge is closed to all Westbound traffic for construction until August 2026. Westbound traffic will follow the detour utilizing the Carter Memorial Bridge, south of the project site. Pedestrian traffic should use the new sidewalk. Cyclists heading westbound should do so on the sidewalk, on foot.
Starting on May 26th, 2026, at 12AM, through June 29th, 2026, at 6 AM, will be closing the Ticonic bridge to all traffic for construction activities requiring access to the entire bridge. 
All travelers must follow the posted detour routes: vehicle traffic will be detoured south via the Carter Memorial Bridge, and pedestrian traffic will be detoured north via the Two Cent Bridge. 
 On June 28th, eastbound traffic will reopen at 6 AM, while westbound traffic will remain closed. Westbound vehicles should continue to use the Carter Memorial Bridge detour until further notice</description><direction>ONE_DIRECTION</direction></incident><incident id="ME24-000086"><polyline>44.31605 -69.807055 44.316152 -69.807621 44.31625 -69.808531 44.316322 -69.809116 44.316351 -69.809557 44.31639 -69.809986 44.316431 -69.810314 44.316459 -69.810567 44.316571 -69.810977 44.316694 -69.811452 44.31671 -69.811852 44.316768 -69.812162 44.316777 -69.812401 44.316774 -69.812819 44.316853 -69.813184 44.316974 -69.813556 44.317061 -69.813799 44.318051 -69.816245 44.317514 -69.81492 44.317128 -69.813968 44.317059 -69.813796 44.316924 -69.81341 44.316849 -69.81318 44.316772 -69.81282 44.316776 -69.812457 44.31674 -69.812452 44.316626 -69.812458 44.316472 -69.81245 44.316354 -69.812435 44.316015 -69.812406 44.31592 -69.812408 44.315696 -69.812425 44.315461 -69.81247 44.315141 -69.812561 44.314588 -69.812706 44.313947 -69.812931</polyline><street>US-202</street><type>CONSTRUCTION</type><starttime>2024-01-08T18:45:00Z</starttime><endtime>2026-06-01T17:45:00Z</endtime><description>Augusta route 202 the Western Ave bridge and the interchange bridge will have periodic lane closures as they work on those bridges. The southbound exit 109B is closed with the detour being exit 109A. </description><direction>ONE_DIRECTION</direction></incident><incident id="ME24-003929"><polyline>44.819257 -68.775281 44.819258 -68.775281</polyline><street>ME-15</street><type>CONSTRUCTION</type><starttime>2024-09-19T14:00:00Z</starttime><endtime>2026-11-07T04:00:00Z</endtime><description>Bangor - Interstate 95 - Exit 185 North and South bound lanes Bridge replacement with ramp improvements with lane closures or full closures will be mostly done at night. They will be performing a southbound lane closure on I-95 where it passes over Broadway in Bangor on Tuesday, March 5th. This closure is scheduled to run from 9:00 a.m. until 3:00 p.m. This closure is required to accommodate the set-up of equipment and the safety of workers. Southbound traffic will be reduced to a single lane through the work zone. Northbound lanes will not be affected.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME24-004030"><polyline>45.62427 -68.258779 45.62427 -68.258778</polyline><street>US-2</street><type>CONSTRUCTION</type><starttime>2024-11-25T09:00:00Z</starttime><endtime>2026-06-26T07:59:59Z</endtime><description>Macwahoc Route 170 - At Kingsman Rd Bridge - Bridge Work will close down the Kingman Rd bridge located on State Route 170 over the Macwahoc Stream starting on November 25th 2024 and going until October 30th 2025 - A temporary road detour will be in place to redirect traffic around the bridge during the bridge closure period - The detour will have one lane alternating traffic with a traffic signal - Wide loads greater than 11 ft - seek alternative route - Use caution </description><direction>ONE_DIRECTION</direction></incident><incident id="ME24-004744"><polyline>44.749726 -68.845025 44.749726 -68.845026</polyline><street>ME-9</street><type>CONSTRUCTION</type><starttime>2024-12-02T12:00:00Z</starttime><endtime>2027-06-30T21:00:00Z</endtime><description>Hampden - US Route 202 Northbound bridge located over Souadabscook Stream - will be closed to traffic and NB traffic will utilize crossovers onto the Southbound bridge and lanes will be reduced to one 10.5
wide lane in each direction - starting at 7:00 A.M. on December 2 2024 for bridge work - use caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-000072"><polyline>44.513401 -69.418954 44.513402 -69.418954</polyline><street>US-202</street><type>CONSTRUCTION</type><starttime>2025-01-08T20:05:44Z</starttime><endtime>2026-06-30T21:00:00Z</endtime><description>Albion the Puddle Dock bridge on Freedom Road is currently closed to traffic at the bridge location with a detour via North Palermo road, to route 137 and then to route 202. Construction is anticipated to begin on January 22, 2025 to do the repairs that are needed.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-000284"><polyline>43.640151 -70.293373 43.637915 -70.295626 43.635601 -70.301076 43.63321 -70.307642 43.632915 -70.307084</polyline><street>I-295</street><type>CONSTRUCTION</type><starttime>2025-02-12T01:00:00Z</starttime><endtime>2026-10-25T10:00:00Z</endtime><description>South Portland 295 North and South bound Lane closures at the exit 4 interchange.  Veterans memorial bridge to south bound I-295 will be reduced to one lane and the ramp to south bound US route 1 from Veterans memorial bridge will be closed and detoured to Exit 3. The bridge will also have a 11-foot width restriction in addition to being reduced to one lane. The work on I-295 will be limited to the hours of operation of 8pm-6am Sunday through Friday. 

****UPDATE**** 

I-295 South Bound Exit 4 will be closed on Thursday night, April 9th at 19:00 and will be open Friday morning April 10th at 06:00. 
Traffic will be detoured to Exit 3 



</description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-000553"><polyline>44.368923 -68.330589 44.369061 -68.32868 44.369736 -68.326341</polyline><street>ME-102</street><type>CONSTRUCTION</type><starttime>2025-08-05T10:00:00Z</starttime><endtime>2026-10-05T22:00:00Z</endtime><description>Mount Desert starting August 5th, 2025, the Babson bridge will be closed with a temporary detour bridge in place that has an 11-foot width restriction. There could be one-lane intermittent traffic closures on occasion for bridge work. </description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-000791"><polyline>44.378177 -68.206655 44.378177 -68.206654</polyline><street>ME-3</street><type>CONSTRUCTION</type><starttime>2025-06-01T10:00:00Z</starttime><endtime>2026-10-29T22:00:00Z</endtime><description>Bar Harbor - Ledgelawn Avenue/Great Meadow Drive - From Cromwell Harbor Road Southerly 0.15 mile to the Cromwell Brook bridge -To Cromwell Brook bridge, to Bar Harbor Transfer Station - Bridge work - reduced to one lane -  Monday thru Friday 6am to 6pm - use caution
</description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-000880"><polyline>45.236538 -68.677281 45.236538 -68.67728</polyline><street>ME-6</street><type>CONSTRUCTION</type><starttime>2025-03-04T11:00:00Z</starttime><endtime>2026-11-15T23:00:00Z</endtime><description>Howland RT 155 overpass of 95 North and South bound lanes Bridge Construction Reduced to one lane. Traffic will be controlled by temporary traffic signals. One lane on I-95 NB or SB may be closed temporarily during the day for construction activities. There will not be a permanent closure on I-95 north or south bound.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-001236"><polyline>44.212292 -70.537593 44.212293 -70.537593</polyline><street>ME-117</street><type>CONSTRUCTION</type><starttime>2025-04-10T10:00:00Z</starttime><endtime>2026-10-30T21:00:00Z</endtime><description>Norway Rte 117 Tannery Brook Bridge #3610 located on Main Street/Route 17 over Tannery Brook approximately 0.15 miles Westerly of Junction Route 118 in Norway, Maine reduced to two 11 feet lanes starting April 10, 2025 due to bridge construction.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-002017"><polyline>47.195323 -68.8428 47.194586 -68.844313 47.193828 -68.845836 47.193682 -68.846179 47.193398 -68.848872 47.192202 -68.852048 47.191473 -68.853561 47.190321 -68.854881 47.189811 -68.856179 47.188892 -68.859312 47.187944 -68.865255 47.187026 -68.867187 47.185852 -68.868774 47.184364 -68.87048 47.183438 -68.87136 47.18241 -68.872165 47.181003 -68.873688 47.178997 -68.8768 47.177152 -68.880587 47.17503 -68.884782 47.1746 -68.885533 47.170946 -68.889095 47.1701 -68.891369 47.169662 -68.892764 47.169115 -68.895318 47.168276 -68.897882 47.168145 -68.899008 47.169101 -68.902892 47.169699 -68.904362 47.169779 -68.905843 47.169677 -68.907076 47.168619 -68.909362 47.163717 -68.922301 47.156685 -68.935561 47.152599 -68.941226 47.148601 -68.943801 47.143931 -68.942814 47.136633 -68.93672 47.134881 -68.936119 47.129188 -68.929768 47.125334 -68.931227 47.120837 -68.930841 47.11853 -68.932257 47.114763 -68.936076 47.1086 -68.946548 47.108162 -68.949723 47.107578 -68.954401 47.108249 -68.960409 47.108863 -68.964658 47.110703 -68.969035 47.108454 -68.976202 47.106614 -68.978091 47.100947 -68.979035 47.09896 -68.981781 47.097178 -68.986931 47.091832 -68.992467 47.088764 -69.008174 47.08929 -69.023323 47.084322 -69.032336 47.083884 -69.034567 47.082744 -69.039846 47.083533 -69.045511 47.08384 -69.047313 47.084088 -69.047892 47.085506 -69.047721 47.08907 -69.05139 47.089596 -69.053836 47.092255 -69.059179 47.093672 -69.061003 47.096769 -69.069607 47.098989 -69.07377 47.101852 -69.077203 47.102904 -69.080508 47.107402 -69.083297 47.109184 -69.085272 47.111988 -69.090464 47.111112 -69.092953</polyline><street>ME-161</street><type>CONSTRUCTION</type><starttime>2025-06-29T10:00:00Z</starttime><endtime>2026-07-31T22:00:00Z</endtime><description>Saint Francis - Allagash  Rte 161 single lane traffic alternating direction due to paving. Saint John River Bridge/Dickey bridge on RT 161 in Allagash and continuing northeast 17.96 miles, Paving. Use Caution.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-002375"><polyline>45.115749 -70.474127 45.117551 -70.47402 45.119595 -70.472239 45.124273 -70.466445 45.127877 -70.461746 45.130132 -70.459042 45.131616 -70.45621 45.132312 -70.454622 45.135324 -70.451575 45.138215 -70.448528 45.140955 -70.445138 45.141349 -70.44473</polyline><street>ME-16</street><type>CONSTRUCTION</type><starttime>2025-07-21T10:00:00Z</starttime><endtime>2026-08-07T21:00:00Z</endtime><description>Coplin PLT Route 16 from the Nash stream Bridge to the intersection of Route 27 will be reduced to one lane with an 11-foot width restriction starting July 21st, 2025, for road maintenance.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-002602"><polyline>45.0259 -69.030201 45.027515 -69.030651 45.0286 -69.03136 45.031299 -69.034267 45.034428 -69.03756 45.038464 -69.04283 45.04395 -69.050034 45.045891 -69.052054 45.047504 -69.053477 45.053385 -69.057325 45.055027 -69.058445 45.057098 -69.060592 45.061253 -69.06578 45.062458 -69.066614 45.064678 -69.067421 45.068693 -69.068415 45.07 -69.069037 45.071302 -69.069859 45.072937 -69.071112 45.079614 -69.077389 45.082988 -69.080741 45.090882 -69.089525 45.092327 -69.091087 45.093221 -69.092029 45.09945 -69.100043 45.103451 -69.105096 45.105724 -69.10846 45.107443 -69.110077 45.108968 -69.111427 45.111018 -69.11316 45.113019 -69.114691 45.118493 -69.118482 45.122878 -69.122695 45.124908 -69.124554 45.128006 -69.128098 45.129248 -69.129254 45.141932 -69.133747 45.141396 -69.134722</polyline><street>ME-11</street><type>CONSTRUCTION</type><starttime>2025-07-07T10:00:00Z</starttime><endtime>2026-07-03T22:00:00Z</endtime><description>Charleston to Dover-Foxcroft, RT 15, Beginning 0.05 of a mile north of the Corinth Town Line and extending north 9.59 miles. Paving, reduced to one lane. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-003247"><polyline>43.786937 -70.187054 43.786123 -70.188116 43.785364 -70.189457 43.784807 -70.190337 43.78421 -70.191314 43.783738 -70.192279 43.78287 -70.193374 43.782653 -70.193663</polyline><street>I-295</street><type>CONSTRUCTION</type><starttime>2025-09-15T02:00:00Z</starttime><endtime>2027-09-01T02:00:00Z</endtime><description>Yarmouth on 295 north and south bound exits at mile 15 as well as route 1 that goes under 295 will have lane closures starting September 14th, 2025, for bridge replacement.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-003292"><polyline>44.769833 -69.409835 44.769834 -69.409835</polyline><street>I-95</street><type>CONSTRUCTION</type><starttime>2025-09-02T10:00:00Z</starttime><endtime>2026-06-30T22:00:00Z</endtime><description>Pittsfield I-95 north and southbound at mile 149, and Web Rd will be reduced to one lane with a 15-foot width restriction due to bridge work and roadway reconstruction.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-003332"><polyline>43.457944 -70.60579 43.457547 -70.605581 43.457138 -70.605398 43.45641 -70.605355 43.455954 -70.605495 43.455164 -70.605983 43.454735 -70.606305 43.454369 -70.606369</polyline><street>ME-35</street><type>CONSTRUCTION</type><starttime>2025-09-15T10:00:00Z</starttime><endtime>2026-07-03T22:00:00Z</endtime><description>Arundel to Lyman Route 35 from near the intersection of Bittersweet Drive to near the intersection of Days Mills Road will be closed to all vehicular, bicycle and
pedestrian traffic starting 9/15 at 6am for the removal and replacement of the existing Days Mills Bridge. Please follow the signed detour utilizing The Maine Turnpike &amp; State Route 111.   </description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-003700"><polyline>43.784793 -70.190377 43.784794 -70.190377</polyline><street>US-1</street><type>CONSTRUCTION</type><starttime>2025-10-05T22:00:00Z</starttime><endtime>2027-08-31T10:00:00Z</endtime><description>Yarmouth, US Rt. 1 overpass on 295 at exit 15 north and south bound will have alternating lane closures, lane shifts, and rolling slowdowns due to bridge replacement. The work will occur during the day mostly, but some night work will be involved. </description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-003837"><polyline>44.234065 -68.348035 44.234064 -68.348035</polyline><street>ME-102A</street><type>CONSTRUCTION</type><starttime>2025-10-22T10:00:00Z</starttime><endtime>2026-07-22T21:00:00Z</endtime><description>Bass Harbor starting October 22nd there will be electrical upgrades being done for the ferry pen and terminal. Day and night work is expected but will not impact traffic.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-003838"><polyline>44.18175 -68.422301 44.181749 -68.422301</polyline><street>Bass Harbor Ferry</street><type>CONSTRUCTION</type><starttime>2025-10-22T10:00:00Z</starttime><endtime>2026-07-01T21:00:00Z</endtime><description>Swan's Island starting October 22nd there will be electrical upgrades being done for the ferry pen and terminal. Day and night work is expected but will not impact traffic.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-004108"><polyline>44.779037 -68.797099 44.778386 -68.797775 44.77791 -68.798392 44.777559 -68.798805 44.777358 -68.799191 44.777 -68.79976 44.776634 -68.800274 44.776135 -68.801047 44.77548 -68.802029 44.775096 -68.802576 44.774985 -68.802723</polyline><street>US-202</street><type>CONSTRUCTION</type><starttime>2025-11-06T11:00:00Z</starttime><endtime>2026-08-06T20:30:00Z</endtime><description>Hampden, RT 202 from the intersection of McCaw Road to the intersection of Carey Drive will be reduced to one lane for bridge work. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-004139"><polyline>43.88133 -69.67175 43.881329 -69.67175</polyline><street>Sawyer Island Rd</street><type>CONSTRUCTION</type><starttime>2025-11-07T18:32:14Z</starttime><endtime>2026-05-30T14:09:00Z</endtime><description>Boothbay - At the Barters Island Bridge is closed to Marine traffic only, for the winter.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000301"><polyline>45.058271 -67.118316 45.058272 -67.118316</polyline><street>US-1</street><type>CONSTRUCTION</type><starttime>2026-01-19T11:00:00Z</starttime><endtime>2027-09-27T22:00:00Z</endtime><description>Robbinston the Mill Cove bridge on route 1 will have alternating lane detours with a 12-foot width restriction for bridge work starting January 19, 2026. A temporary detour road will be constructed and in use for the duration of the project with intermittent delays and stoppages. The detour will be controlled by portable traffic signals.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000409"><polyline>44.055274 -70.220184 44.056677 -70.216799 44.058254 -70.214181 44.06288 -70.208855 44.06596 -70.205474 44.065917 -70.205318</polyline><street>I-95</street><type>CONSTRUCTION</type><starttime>2026-01-28T12:45:17Z</starttime><endtime>2026-01-28T12:45:17Z</endtime><description>On I-95 northbound from mile 78 to 79 in Lewiston the left lane will be closed for bridge construction until further notice. </description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000410"><polyline>44.066081 -70.205725 44.060976 -70.211231 44.059479 -70.212868 44.056982 -70.216623 44.056057 -70.218606 44.055427 -70.220341 44.055448 -70.220341</polyline><street>I-95</street><type>CONSTRUCTION</type><starttime>2026-01-28T12:51:57Z</starttime><endtime>2026-01-28T12:51:57Z</endtime><description>On I-95 southbound from mile 79 to 78 in Lewiston the left lane will be closed for bridge construction until further notice. </description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000511"><polyline>43.958527 -70.566112 43.958528 -70.566112</polyline><street>US-302</street><type>CONSTRUCTION</type><starttime>2026-02-06T11:00:00Z</starttime><endtime>2026-05-21T22:00:00Z</endtime><description>Casco / Naples town line Rte 302 Crooked River Bridge 12-foot width restriction starting February 9, 2026 until May 21, 2026 reduced to one lane with temporary traffic lights due to bridge construction Use Caution.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000512"><polyline>43.774447 -70.502202 43.774448 -70.502202</polyline><street>ME-35</street><type>CONSTRUCTION</type><starttime>2026-02-16T12:00:00Z</starttime><endtime>2026-05-31T21:00:00Z</endtime><description>Standish at the intersection of RT 35 and RT 237, Road Maintenance, reduced to one lane. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000540"><polyline>44.156834 -70.491409 44.156835 -70.491409</polyline><street>ME-26</street><type>CONSTRUCTION</type><starttime>2026-02-16T12:00:00Z</starttime><endtime>2026-05-31T20:00:00Z</endtime><description>Oxford, RT 26 at Oxford Lawn and Garden, Road Maintenance, reduced to one lane. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000541"><polyline>44.370727 -69.391577 44.370727 -69.391576</polyline><street>ME-3</street><type>CONSTRUCTION</type><starttime>2026-02-08T11:16:04Z</starttime><endtime>2026-02-08T11:16:04Z</endtime><description>Palermo, RT 3 at Banton Rd, Road Maintenance, reduced to one lane. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000542"><polyline>44.393903 -70.973814 44.393903 -70.973813</polyline><street>US-2</street><type>CONSTRUCTION</type><starttime>2026-02-16T12:00:00Z</starttime><endtime>2026-05-31T21:00:00Z</endtime><description>Gilead, near Bridge St on RT 2, Road Maintenance, reduced to one lane. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000543"><polyline>44.642564 -70.109497 44.642564 -70.109496</polyline><street>US-2</street><type>CONSTRUCTION</type><starttime>2026-02-16T12:00:00Z</starttime><endtime>2026-05-31T20:00:00Z</endtime><description>Farmington, In the area of Davis Rd and RT 2, Road Maintenance, reduced to one lane. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000544"><polyline>44.459987 -68.098886 44.459986 -68.098886</polyline><street>ME-186</street><type>CONSTRUCTION</type><starttime>2026-02-08T11:32:22Z</starttime><endtime>2026-02-08T11:32:22Z</endtime><description>Gouldsboro, RT 186 at Taft Point Rd, Road Maintenance, Reduced to one lane. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000545"><polyline>44.892271 -69.807905 44.892272 -69.807905</polyline><street>US-201</street><type>CONSTRUCTION</type><starttime>2026-02-16T12:00:00Z</starttime><endtime>2026-05-31T20:00:00Z</endtime><description>Madison, on RT 201 near Robbins Hill, Road Maintenance, Reduced to one lane. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000546"><polyline>44.909107 -67.225447 44.909108 -67.225447</polyline><street>US-1</street><type>CONSTRUCTION</type><starttime>2026-02-08T11:43:54Z</starttime><endtime>2026-02-08T11:43:54Z</endtime><description>Dennysville, at the RT 1 and Shipyard Rd, Road Maintenance, Reduced to one lane. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000547"><polyline>45.015239 -69.24978 45.015239 -69.249781</polyline><street>ME-94</street><type>CONSTRUCTION</type><starttime>2026-02-16T12:00:00Z</starttime><endtime>2026-05-31T20:00:00Z</endtime><description>Dexter, RT 94 near Dunn Rd, Road Maintenance, Reduced to one lane. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000548"><polyline>45.150238 -70.44632 45.150239 -70.44632</polyline><street>ME-27</street><type>CONSTRUCTION</type><starttime>2026-02-16T12:00:00Z</starttime><endtime>2026-05-31T20:00:00Z</endtime><description>Eustis, RT 27 at Vaughn Rd, Road Maintenance, Reduced to one lane. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000549"><polyline>45.522504 -70.094638 45.522505 -70.094638</polyline><street>US-201</street><type>CONSTRUCTION</type><starttime>2026-02-16T12:00:00Z</starttime><endtime>2026-05-31T20:00:00Z</endtime><description>Johnson Mountain Township, RT 201 near American Way, Road Maintenance, Reduced to one lane. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000550"><polyline>45.418823 -67.735671 45.418823 -67.73567</polyline><street>ME-6</street><type>CONSTRUCTION</type><starttime>2026-02-16T12:00:00Z</starttime><endtime>2026-05-31T20:00:00Z</endtime><description>Topsfield, at the intersect og RT 6 and RT 1, Road Maintenance, Reduced to one lane. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000551"><polyline>45.730511 -68.838959 45.730512 -68.838959</polyline><street>ME-11</street><type>CONSTRUCTION</type><starttime>2026-02-16T12:00:00Z</starttime><endtime>2026-05-31T20:00:00Z</endtime><description>T1 R9 Wels near 1888 Golden Rd, Millinocket, ME 04462, Road Maintenance, Reduced to one lane. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000552"><polyline>45.906849 -67.837043 45.90685 -67.837043</polyline><street>US-1</street><type>CONSTRUCTION</type><starttime>2026-02-16T12:00:00Z</starttime><endtime>2026-05-31T20:00:00Z</endtime><description>Amity on RT 1 near Jakes Rd, Road Maintenance, Reduced to one lane. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000553"><polyline>46.001913 -68.475624 46.001913 -68.475625</polyline><street>ME-159</street><type>CONSTRUCTION</type><starttime>2026-02-16T12:00:00Z</starttime><endtime>2026-05-31T20:00:00Z</endtime><description>Patten at the RT 159 and Waters Rd intersection, Road Maintenance, Reduced to one lane, Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000554"><polyline>47.312199 -68.159014 47.3122 -68.159014</polyline><street>US-1</street><type>CONSTRUCTION</type><starttime>2026-02-16T12:00:00Z</starttime><endtime>2026-05-31T20:00:00Z</endtime><description>Grand Isle at the RT 1 and Corbin Rd intersection, Road Maintenance, Reduced to one lane. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000560"><polyline>45.183846 -69.21915 45.183847 -69.21915</polyline><street>ME-15</street><type>CONSTRUCTION</type><starttime>2026-03-25T10:00:00Z</starttime><endtime>2028-10-15T22:00:00Z</endtime><description>Dover - Foxcroft Essex Street Bridge closed starting March 25, 2026, between River Street and Essex Street due bridge replacement. Project location begins at the intersection of Essex and River Street and ends at the intersection of Essex and Lincoln Street. The bridge over Essex Street will be closed to through traffic from March 25, 2026, to December 1, 2027. Drivers and pedestrians should follow the detour map and detour signs while on site. Motorists should expect delays and use caution when traveling through the detour zone.
</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000652"><polyline>43.812659 -70.153501 43.81266 -70.153501</polyline><street>US-1</street><type>CONSTRUCTION</type><starttime>2025-09-04T00:00:00Z</starttime><endtime>2026-05-21T22:00:00Z</endtime><description>Yarmouth, RT 1 at the Cousins River bridge, Bridge Construction, starting Wednesday night March 4th and Tuesday night March 10th from 8:00 p.m. through 6:00 a.m. CPM Constructors will be limiting traffic on US Rt. 1., During this time, four separate 25-minute closures, two each night, will be utilized.  I-295 mainline traffic is not expected to be affected by this operation.Please plan accordingly. </description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000766"><polyline>44.912855 -68.684519 44.912515 -68.684672 44.912027 -68.68493 44.911309 -68.685284 44.911309 -68.685281 44.911299 -68.68527</polyline><street>Stillwater Ave</street><type>CONSTRUCTION</type><starttime>2026-03-02T11:30:00Z</starttime><endtime>2028-08-18T21:00:00Z</endtime><description>Old Town LLEWELLYN ESTES bridge will be reduced to one lane with a 12-foot width restriction 3/2/26 - 3/5/26 for bridge maintenance.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000889"><polyline>43.731231 -70.231369 43.73123 -70.231369</polyline><street>I-295</street><type>CONSTRUCTION</type><starttime>2026-03-30T02:00:00Z</starttime><endtime>2026-04-13T09:00:00Z</endtime><description>Falmouth, South on 295 at Exit 10, There are the 2 Spur Bridges over I-295 and over the State-owned railroad that is located approximately 850 feet westerly of the I-295 bridge on the Spur, 
anticipate that the four (4) test borings located along the EB side of the Spur will take 4 to 5 nights to complete at which time we will move to the test borings on either the Spur WB or I-295 SB. Intermittent lane closures for road maintenance, Sunday: 10:00 PM-05:00 AM; Monday-Thursday: 9:00 PM -5:00 AM, no work April 5th. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-000963"><polyline>44.674147 -69.183429 44.674148 -69.183429</polyline><street>US-202</street><type>CONSTRUCTION</type><starttime>2026-06-01T10:00:00Z</starttime><endtime>2026-10-30T22:00:00Z</endtime><description>Dixmont - RT 202 at the Crocker Brook bridge, Bridge Maintenance, reduced to one lane, Use Caution and Expect delays. </description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001055"><polyline>43.479341 -70.631126 43.479259 -70.63207</polyline><street>ME-111</street><type>CONSTRUCTION</type><starttime>2026-03-23T22:00:00Z</starttime><endtime>2026-07-31T11:00:00Z</endtime><description> Lyman Route 111 at the intersection of Kennebunk Pond Road and Day Road there will be alternating lane closures with an 11 foot width restriction for road reconstruction and intersection improvements. Construction of dedicated left turn lanes and shared lanes for through and right turning vehicles with raised concrete islands at either end of the project on the approaches to the intersection of Kennebunk Pond Rd and Day Rd from the west and the east. Includes the installation of traffic signals and an ATC cabinet.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001069"><polyline>43.669021 -70.302253 43.669883 -70.294936 43.669937 -70.294206 43.669891 -70.29157 43.670097 -70.289837 43.670825 -70.288005 43.670926 -70.287614 43.670957 -70.286686 43.670815 -70.284435 43.670288 -70.284328 43.669314 -70.283966 43.667829 -70.284129 43.666753 -70.283836 43.665484 -70.283013 43.661891 -70.279048 43.661842 -70.278779 43.661654 -70.278726 43.659545 -70.276384 43.659004 -70.275785 43.658676 -70.275359 43.65823 -70.274616 43.657801 -70.274074 43.657312 -70.2738 43.656427 -70.273492 43.656445 -70.273615 43.656509 -70.27372</polyline><street>ME-25</street><type>CONSTRUCTION</type><starttime>2026-03-30T10:00:00Z</starttime><endtime>2026-07-31T23:00:00Z</endtime><description>Portland from  Brighton Ave - Woodford st. to Deering Ave - Forest Ave to Deering Ave - Park Ave, Road Maintenance, Reduced to one lane, Weekdays from 6AM to 7PM. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001078"><polyline>45.308256 -69.525958 45.308256 -69.525957</polyline><street>ME-6</street><type>CONSTRUCTION</type><starttime>2026-04-06T10:00:00Z</starttime><endtime>2026-08-19T22:00:00Z</endtime><description>Greenville, Shirley, Monson and Abbot, State Route 6/15, Reduced to one lane due to Road Maintenance and Paving Operations from Lily Bay Rd extending South 24.72 miles and ending .05 miles North of Guilford-Abbot townline. Mon through Saturday 6AM to 8PM. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001174"><polyline>44.027541 -70.288733 44.022013 -70.292521 44.017677 -70.295514 44.016651 -70.296211 44.014699 -70.297896 44.009259 -70.302713 44.007153 -70.304494 44.005563 -70.305503 44.002283 -70.306887 43.997521 -70.308646 43.996394 -70.309 43.995229 -70.309215 43.99245 -70.309429 43.988266 -70.309784</polyline><street>I-95</street><type>CONSTRUCTION</type><starttime>2026-04-06T13:00:00Z</starttime><endtime>2026-04-06T19:00:00Z</endtime><description>Monday 4/6, there will be a southbound right lane closure from mile 74 in Auburn to mile 71 in New Gloucester from 9:00am to 3:00pm for guardrail repairs. Speeds are reduced to 60mph. </description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001159"><polyline>44.835615 -68.742354 44.828608 -68.740819 44.828699 -68.740755</polyline><street>I-95</street><type>CONSTRUCTION</type><starttime>2026-04-13T11:00:00Z</starttime><endtime>2027-11-12T11:00:00Z</endtime><description>Bangor, Hogan Rd Bridge, Bridge Construction and Ramp realignments, multiple lanes reduced to one lane in each direction. Mon-Fri 7AM-6PM. Use Caution</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001172"><polyline>43.413495 -70.557699 43.420034 -70.554062 43.423731 -70.551914 43.426139 -70.550165 43.429941 -70.54744 43.435145 -70.543556 43.439945 -70.540026 43.443957 -70.537054 43.448918 -70.533353 43.452587 -70.530681 43.457782 -70.526765 43.460873 -70.524501 43.462291 -70.52315 43.463412 -70.521808 43.464222 -70.520703 43.468964 -70.513805 43.473581 -70.507081</polyline><street>I-95</street><type>CONSTRUCTION</type><starttime>2026-04-06T11:00:00Z</starttime><endtime>2026-04-09T21:00:00Z</endtime><description>Monday 4/6 to Thursday 4/9, there will be a northbound right lane closure from mile 26 in Kennebunk to mile 31 in Biddeford from 7:00am to 5:00pm for project cleanup and stump grinding. Speeds are reduced to 60mph. </description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001106"><polyline>44.719965 -67.449579 44.719966 -67.449579</polyline><street>US-1</street><type>CONSTRUCTION</type><starttime>2026-04-01T10:00:00Z</starttime><endtime>2026-04-30T22:00:00Z</endtime><description>Machias, at the Dike Bridge on RT 1, Machias Dike Project closure will begin on 4/1/2026 at 6:00am. This will be a full closure of the road to replace the existing temporary bridge. Follow the signed detour from Hadley Lake Road to Ridge Road then Route 192.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001161"><polyline>44.830798 -68.7437 44.831429 -68.743153 44.833529 -68.742145 44.834294 -68.741356 44.835055 -68.740058</polyline><street>I-95</street><type>CONSTRUCTION</type><starttime>2026-04-13T10:00:00Z</starttime><endtime>2026-07-01T22:00:00Z</endtime><description>Bangor Exit 187 SB, Ramp realignments, Reduced to one lane. Southbound traffic under the Exit 187 bridges, shall provide through lanes between 5AM and 8PM from July 1st to September 12th, throughout construction.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001165"><polyline>43.101752 -70.750866 43.104252 -70.747909 43.109104 -70.741611 43.113898 -70.735399 43.119216 -70.728533 43.121346 -70.72584 43.122207 -70.724895 43.123617 -70.723565 43.127916 -70.719424 43.131619 -70.715851 43.132449 -70.71495 43.132997 -70.714349 43.133874 -70.713094 43.134978 -70.711259 43.136035 -70.709167 43.139354 -70.702075 43.142956 -70.694404 43.147324 -70.685156 43.152466 -70.67433 43.157444 -70.663805 43.158704 -70.661145 43.160246 -70.658784 43.161874 -70.656821 43.162899 -70.655866 43.16426 -70.654804 43.165583 -70.654021 43.16689 -70.653398 43.170231 -70.652175 43.174887 -70.65047 43.180645 -70.648377 43.186278 -70.646339 43.187545 -70.645942 43.189047 -70.645588 43.193466 -70.645051 43.199301 -70.644343 43.202109 -70.643946 43.203579 -70.643614 43.205276 -70.643034 43.210578 -70.641221 43.21706 -70.639065 43.222643 -70.637176 43.227435 -70.636404 43.228412 -70.636265 43.230296 -70.635707 43.232125 -70.634966 43.234947 -70.633346 43.239918 -70.630256 43.245866 -70.626619 43.250687 -70.62368 43.254391 -70.621405 43.25561 -70.620772 43.257611 -70.619989 43.259884 -70.619592 43.264885 -70.619088 43.270892 -70.618498 43.277735 -70.617789 43.284523 -70.617092 43.291106 -70.616448 43.297908 -70.615762 43.304466 -70.615097 43.309783 -70.614539 43.311422 -70.614195 43.313156 -70.613552 43.315607 -70.612275 43.320977 -70.609282 43.327159 -70.605859 43.3338 -70.602125</polyline><street>I-95</street><type>CONSTRUCTION</type><starttime>2026-04-06T15:00:00Z</starttime><endtime>2026-04-06T20:00:00Z</endtime><description>Monday 4/6, there will be a northbound rolling left lane closure from mile 1 in Kittery to mile 20 in Wells for trash removal. Please use caution and stay alert. </description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001116"><polyline>47.151109 -67.968927 47.151022 -67.968796</polyline><street>Castonguay Road</street><type>CONSTRUCTION</type><starttime>2026-05-04T10:00:00Z</starttime><endtime>2026-10-30T21:00:00Z</endtime><description>Van Buren St. Mary's bridge on Castonguay street will be closed starting May 4th for bridge replacement. Seek alternate route during that time.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME25-001338"><polyline>44.097979 -70.231298 44.096284 -70.231513 44.094759 -70.231449 44.093618 -70.231019 44.092446 -70.230566 44.091729 -70.230405 44.090542 -70.230663 44.089918 -70.231371 44.089283 -70.232546 44.088755 -70.23364 44.088242 -70.234573 44.087614 -70.235963 44.087225 -70.237089 44.086647 -70.238001 44.086065 -70.239069 44.084593 -70.242089 44.082435 -70.248483 44.082374 -70.250887 44.082004 -70.256938 44.082559 -70.248183 44.084655 -70.242389 44.086258 -70.238441 44.087737 -70.235909 44.088693 -70.233592 44.090388 -70.230674 44.087953 -70.231274 44.087244 -70.232261 44.088601 -70.233678 44.087121 -70.231532 44.085795 -70.232004 44.083083 -70.232948 44.079692 -70.23621 44.077256 -70.239385 44.077248 -70.239394</polyline><street>US-202</street><type>CONSTRUCTION</type><starttime>2026-04-19T22:30:00Z</starttime><endtime>2026-09-16T10:00:00Z</endtime><description>Auburn starting April 19th there will be alternating lane closures with a 12-foot width restriction on Court Street, Minot Ave as well as Washington street and the rotary for night time paving. It will occur Sunday through Friday from 630pm until 6am the next day.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001171"><polyline>43.374495 -70.579484 43.381317 -70.575701 43.386759 -70.572644 43.400262 -70.565091</polyline><street>I-95</street><type>CONSTRUCTION</type><starttime>2026-04-10T11:00:00Z</starttime><endtime>2026-04-10T21:00:00Z</endtime><description>Friday 4/10, there will be a northbound right lane closure from mile 23 in Wells to mile 25 in Kennebunk from 7:00am to 5:00pm for stump grinding. Speeds are reduced to 60mph. </description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001167"><polyline>43.16834 -70.653134 43.166043 -70.654078 43.165026 -70.65462 43.164063 -70.655264 43.162654 -70.656412 43.161747 -70.657281 43.160667 -70.658804 43.15871 -70.661653 43.157857 -70.663348 43.15648 -70.666277 43.15446 -70.670547 43.152558 -70.674549 43.150194 -70.679516 43.148508 -70.683073 43.146543 -70.687214 43.14385 -70.693002 43.141783 -70.697396 43.140229 -70.70063 43.138331 -70.704632 43.135806 -70.709911 43.135074 -70.711493 43.134001 -70.713253</polyline><street>I-95</street><type>CONSTRUCTION</type><starttime>2026-04-07T12:00:00Z</starttime><endtime>2026-04-07T20:00:00Z</endtime><description>Tuesday 4/7, there will be a southbound left lane closure from mile 8 in York to mile 4 in Kittery from 8:00am to 4:00pm for guardrail repairs. Speeds are reduced to 60mph. </description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001166"><polyline>43.333925 -70.602361 43.320509 -70.609839 43.313725 -70.613594 43.311774 -70.614367 43.309697 -70.614796 43.302592 -70.615483 43.2938 -70.616405 43.283835 -70.617414 43.273509 -70.618487 43.261791 -70.619667 43.258806 -70.619989 43.256728 -70.620525 43.254243 -70.621727 43.246522 -70.626469 43.235205 -70.633486 43.233313 -70.634644 43.231594 -70.635481 43.228717 -70.636447 43.223651 -70.637241 43.222228 -70.637606 43.21577 -70.639773 43.206512 -70.64282 43.203868 -70.643785 43.201585 -70.644236 43.197049 -70.644923 43.189383 -70.645802 43.186817 -70.646382 43.181686 -70.64827 43.168807 -70.652991 43.165552 -70.654321 43.163846 -70.655394 43.161733 -70.65739 43.158634 -70.661831 43.156755 -70.665694 43.149273 -70.681444 43.141601 -70.697837 43.137076 -70.707279 43.134821 -70.711956 43.133224 -70.714446 43.131173 -70.716699 43.125801 -70.721763 43.121714 -70.725775 43.115965 -70.733135 43.108572 -70.742705 43.102074 -70.751272</polyline><street>I-95</street><type>CONSTRUCTION</type><starttime>2026-04-06T15:00:00Z</starttime><endtime>2026-04-06T20:00:00Z</endtime><description>Monday 4/6, there will be a southbound rolling left lane closure from mile 20 in Wells to mile 1 in Kittery for trash removal. Please use caution and stay alert. </description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001175"><polyline>43.645144 -70.257975 43.645982 -70.258598 43.64446 -70.257375 43.645112 -70.257825</polyline><street>Casco Bay Bridge</street><type>HAZARD</type><starttime>2026-04-05T02:13:04Z</starttime><endtime>2026-04-05T06:13:04Z</endtime><description>Casco Bay Bridge will be Closed temporarily so that Marine traffic may pass under bridge, Typically 15 min.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001173"><polyline>43.509863 -70.476384 43.503677 -70.484366 43.502409 -70.485686 43.500401 -70.487306 43.498198 -70.488787</polyline><street>I-95</street><type>CONSTRUCTION</type><starttime>2026-04-14T10:00:00Z</starttime><endtime>2026-04-15T19:00:00Z</endtime><description>Tuesday 4/7 to Wednesday 4/8, there will be a southbound right lane closure from mile 34 in Saco to mile 33 in Biddeford from 6:00am to 3:00pm for concrete barrier removal. Speeds are reduced to 60mph. </description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001177"><polyline>44.04466 -68.858871 44.04466 -68.858872</polyline><street>Vinalhaven Ferry</street><type>ROAD_CLOSED</type><starttime>2026-04-05T10:30:00Z</starttime><endtime>2026-04-05T15:00:00Z</endtime><description>Maine Ferry Service's 7:00 AM and 8:45 AM trips from Vinal Haven to Rockland are cancelled due to an emergency trip.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001179"><polyline>44.104104 -69.099326 44.104105 -69.099326</polyline><street>Rockland Ferry</street><type>ROAD_CLOSED</type><starttime>2026-04-05T09:53:54Z</starttime><endtime>2026-04-05T13:00:00Z</endtime><description>Rockland to Vinalhaven: Sun 4/5 The 7am and 845am trips from RK-VH have been cancelled due to an emergency trip.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001160"><polyline>44.82951 -68.744425 44.830743 -68.741619 44.831119 -68.741319 44.831234 -68.741093 44.83379 -68.740079 44.833725 -68.739988</polyline><street>I-95</street><type>CONSTRUCTION</type><starttime>2026-04-13T10:00:00Z</starttime><endtime>2026-07-01T22:00:00Z</endtime><description>Bangor Exit 187 NB, Ramp realignments, Reduced to one lane. Northbound traffic under the Exit 187 bridges, shall provide through lanes between 5AM and 8PM from July 1st to September 12th, throughout construction.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001148"><polyline>44.103488 -69.097824 44.103489 -69.097824</polyline><street>Rockland Ferry</street><type>HAZARD</type><starttime>2026-04-02T13:24:38Z</starttime><endtime>2026-04-06T14:45:00Z</endtime><description>There will be no boat on Friday 4/3/26 to Matinicus due to weather conditions
Rescheduled date is Monday 4/6/26 with a load time of 10:15am Please plan travel accordingly
</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001168"><polyline>43.278596 -70.617954 43.273179 -70.618501 43.268374 -70.618994 43.26371 -70.619488 43.259014 -70.619949 43.257655 -70.620282 43.255631 -70.62099 43.254615 -70.621515 43.250732 -70.623919</polyline><street>I-95</street><type>CONSTRUCTION</type><starttime>2026-04-07T11:00:00Z</starttime><endtime>2026-04-07T20:00:00Z</endtime><description>Tuesday 4/7, there will be a southbound left lane closure from mile 16 in Wells to mile 14 in Ogunquit from 7:00am to 4:00pm for guardrail repairs. Speeds are reduced to 60mph. </description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001178"><polyline>44.104104 -69.099326 44.104105 -69.099326</polyline><street>Rockland Ferry</street><type>ROAD_CLOSED</type><starttime>2026-04-05T10:30:00Z</starttime><endtime>2026-04-05T15:00:00Z</endtime><description>Maine Ferry Service's 7:00 AM and 8:45 AM trips from Rockland to Vinal have are cancelled due to emergency trip.</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001170"><polyline>43.264359 -70.619145 43.269929 -70.618608 43.275655 -70.617965 43.280193 -70.617557 43.284184 -70.617149 43.289198 -70.616634 43.293735 -70.616194 43.299069 -70.615604 43.304753 -70.615057 43.310179 -70.614456 43.311873 -70.614091 43.313785 -70.613265 43.315987 -70.612096 43.320686 -70.609467</polyline><street>I-95</street><type>CONSTRUCTION</type><starttime>2026-04-08T12:00:00Z</starttime><endtime>2026-04-08T20:00:00Z</endtime><description>Wednesday 4/8, there will be a northbound left lane closure from mile 15 in Ogunquit to mile 19 in Wells from 8:00am to 4:00pm for guardrail repairs. Speeds are reduced to 60mph. </description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001136"><polyline>44.777341 -68.799262 44.777342 -68.799262</polyline><street>US-202</street><type>CONSTRUCTION</type><starttime>2026-04-02T10:34:59Z</starttime><endtime>2026-12-30T20:58:00Z</endtime><description>Hampden Route 202 Reduced to one lane near Penobscot Meadow Drive due to Bridge Maintenance work, use caution and expect delays</description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001169"><polyline>43.224008 -70.636922 43.227534 -70.63644 43.229879 -70.63586 43.232193 -70.634884 43.234726 -70.633468 43.23811 -70.631397 43.243292 -70.628168 43.248809 -70.624852 43.252615 -70.622514 43.254912 -70.621097 43.256452 -70.620411 43.258171 -70.619864 43.259679 -70.619606 43.264366 -70.619166</polyline><street>I-95</street><type>CONSTRUCTION</type><starttime>2026-04-08T11:00:00Z</starttime><endtime>2026-04-08T20:00:00Z</endtime><description>Wednesday 4/8, there will be a northbound right lane closure from mile 12 in York to mile 15 in Ogunquit from 7:00am to 4:00pm for fuel cleanup and guardrail repairs. Speeds are reduced to 60mph. </description><direction>ONE_DIRECTION</direction></incident><incident id="ME26-001180"><polyline>44.04466 -68.858871 44.04466 -68.858872</polyline><street>Vinalhaven Ferry</street><type>ROAD_CLOSED</type><starttime>2026-04-05T09:55:10Z</starttime><endtime>2026-04-05T13:00:00Z</endtime><description>Vinalhaven to Rockland: Sun 4/5 The 7am and 845am trips from VH-RK have been cancelled due to an emergency trip.</description><direction>ONE_DIRECTION</direction></incident></incidents>